Wynn - Diamond Suites Hotel Development in Macau

 

Project  
:
 
Wynn - Diamond Suites Hotel Development, Macau 
Year 
: 2008 
Client
: WYNN 
Engineer
: Benaim 
Main Contractor : Leighton-China State JV 
Scope of Work 





:



 
- 23 nos. 3m diameter bored piles with 4.5m diameter bellouts to maximum depth of 71m.
- 36 nos. 2m diameter bored piles to maximum depth of 62m
- 50 nos. plunge columns install for top-down construction.
- 1.2m thick diaphragm wall with a total length of 297m and with a total excavation area of 14,685m2.
- 30 nos. prebored H piles
- Associated works, including TAM grouting to protect existing building, recharge and dewatering system.