Project Description

Kowloon station is on the Tung Chung line and the Airport Express. It is one of the two Airport Express stations providing in-town check-in services for passengers departing from Hong Kong International Airport.

The station is connected via footbridges to Austin on the Tuen Ma line, which is also connected to West Kowloon Terminus of the Guangzhou–Shenzhen–Hong Kong Express Rail Link Hong Kong section. There are escalators link the landmark shopping mall Elements directly with the station concourse.

Scope of Works

Deep compaction of sand fill by vibroflotation method, and construction of barrettes as foundations and diaphragm walls as retaining structures. The works also include slurry walls for water cut-off and performing a loading test of barrette with test load of 3,000 tons.
– Deep compaction: (a) compaction volume 851,126m3
– Barrettes: (a) 79 nos., (b) length 2.8m, (c) 1.2m & 1.5m thick, (d) depth 40m to 90m, (e) excavation area 14,611m2
– Diaphragm walls: (a) 93m long, (b) 1.2m thick, (c) average depth 50m, (d) excavation area 4,978m2
– Slurry walls: (a) 295m long, (b) 0.8m thick, (c) depth 21m to 31m, (d) excavation area 7,487m2
– Loading test: (a) 1 no.

Owner:
MTR Corporation Limited

Engineer:
Ove Arup & Partners Hong Kong Limited

General contractor:
KEC Joint Venture

Period of works:
Dec. 1994 to Feb. 1996

0
Years in Hong Kong
0M$+
Yearly Turnover
0+
Projects Completed
0+
Employees

You have a project ?

Bachy Soletanche is the Leading and Specialist Geotechnical and Foundation Contractor, contact us without delay.

You have a project ?

Bachy Soletanche is the Leading and Specialist Geotechnical and Foundation Contractor, contact us without delay.