Project Description

Road P2 of the Tseung Kwan O – Lam Tin Tunnel is a vital link in the 11.9km long Route 6 planned between west Kowloon and the Tseung Kwan O development area to the east.

Road P2 links the center of Tseung Kwan O new town with the east end of the main tunnel section of the same project, which is delivering 3.4 km of dual carriageway between the planned Trunk Road T2 of Route 6 to the west and planned Cross Bay Link to the east.

Scope of Works

Construction of large diameter bored piles as foundation of the bridge abutment at Portion IX.
– Bored piles: (a) 10 nos., (b) diameter 2.2m

Owner:
Civil Engineering and Development Department

Engineer:
Aecom Asia Company Limited

General contractor:
China Road & Bridge Corporation-Build King Joint Venture

Period of works:
Jan. 2020 to May 2020

0
Years in Hong Kong
0M$+
Yearly Turnover
0+
Projects Completed
0+
Employees

Related Techniques

You have a project ?

Bachy Soletanche is the Leading and Specialist Geotechnical and Foundation Contractor, contact us without delay.

You have a project ?

Bachy Soletanche is the Leading and Specialist Geotechnical and Foundation Contractor, contact us without delay.