Project Description
Project Description
The Project constructs a 28-storey office tower atop a 2-storey podium and a 4-storey basement.
Scope of Works
Construction of foundations and retaining structures, and carrying out dewatering and excavation and lateral support works. Foundations include large diameter bored piles, while retaining structures include diaphragm walls.
– Diaphragm walls: (a) 1.2m thick, (b) 146m long, (c) excavation area 4,633m2
– Bored piles: (a) 16 nos., (b) diameter 3m
– Excavation and lateral support works: (a) bulk excavation, (b) 5 layers of strut & waling
Owner:
Cherish Shine Ltd. (Swire)
Engineer:
Wong & Ouyang (Civil Structural Engineering) Ltd.
General contractor:
Bachy Soletanche Group Limited
Period of works:
Jun. 2019 to Apr. 2021
Related Techniques
You have a project ?
Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.

You have a project ?
Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.




