Project Description

Construction of bored piles, ELS works, pile caps and structural works in the project of Foundation Works Contract of Building 1 Development, Hong Kong-Shenzhen Innovation and Technology Park.

Scope of Works

Construction of foundations, ELS works, pile caps and structural works. Foundations include large diameter bored piles, while retaining structures include installation of interlocking pipe pile with grout curtain, strut and waling.

– Bored piles: (a) 32 nos., (b) diameter 2.0m to 3.0m, (c) average excavation length 44-45m, (d) average rock socket 6-6.5m

– ELS works: (a) 813mm dia. Interlock pipe pile with total excavation length 10090m, (b) strut & waling total weight 2,600 tonnes.

– Pile Caps: (a) Concrete = 330m3 (b) Reinforcement = 251 tonnes.

– Structural Works: (a) Concrete = 442m3 (b) Reinforcement = 159 tonnes.

Owner:
Hong Kong-Shenzhen Innovation and Technology Park Limited

Engineer:

C M Wong & Associates Ltd

Foundation contractor:
Bachy Soletanche Group Limited

Period of works:
Apr. 2024 to Present

0+
Years in Hong Kong
0M$+
Yearly Turnover
0+
Projects Completed
0+
Employees

You have a project ?

Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.

You have a project ?

Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.